Tags: PRINT, FOOT, CARBON, TIME, COST, MANAGEMENT, VALUE, EARNED, USING, TRACKING, PROJECT, PROJECT TRACKING USING EARNED VALUE MANAGEMENT IN COST TIME AND CARBON FOOT PRINT,
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
PROJECT TRACKING USING EARNED VALUE MANAGEMENT IN COST, TIME AND CARBON FOOT PRINT
#1


.pptx   1454561986-ORIGINAL.pptx (Size: 230.2 KB / Downloads: 5)




MOTIVATION


Current construction industry is complex and need effective project management
Current project monitoring is cost and time centred
On the other hand, sustainability has become the need of the society
Carbon footprint is the focus for achieving sustainability in construction

The society and construction industry demands a solution to these conflicting issues



EARNED VALUE MANAGEMENT


Cost-Time-Quality is the golden triangle of project parameters
Earned Value Management is the most effective project tracking approach that can track cost and schedule performance
The quality is considered as the baseline satisfaction


We target to add the quality parameter by tracking the sustainability in the form of Carbon footprint



OBJECTIVES AND SCOPE


To monitor cost, time and carbon footprint of the construction project.
Apply the framework in a case to validate the applicability.




EXPECTED CONTRIBUTION


A framework for integrating sustainability in construction project tracking
The first demonstration of the framework to prove the concept of carbon footprint tracking




A step towards sustainable construction culture
Reply


[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  MANAGEMENT OF CANAL IRRIGATION IN INDIA seminar paper 1 31,825 21-09-2017, 11:44 AM
Last Post: jaseela123
  in that training i knew how paper and pulp manufactured in industry level and what ar subine 1 649 13-09-2017, 09:42 AM
Last Post: jaseela123
  A Study Of Mixed Traffic Behaviour and Management Control At Shahibaugh Underpass, Ah seminar code 1 798 09-09-2017, 10:52 AM
Last Post: jaseela123
  Short-term aging characterization of asphalt binders using gel permeation chromatogra smart paper boy 1 141,149 08-09-2017, 04:34 PM
Last Post: jaseela123
  EFFECT ON COMPRESSIVE STRNGTH OF CONCRETE USING RECYCLED COARSE AGGREGATES FROM DEMOL seminar code 1 534 07-09-2017, 10:51 AM
Last Post: jaseela123
  AN EXPERIMENTAL STUDY ON HIGH STRENGTH CONCRETE USING FLYASH AND ALCCOFINE seminar code 1 583 02-09-2017, 04:19 PM
Last Post: jaseela123
  A Mini-Project On DESIGN OF FOOTINGS & COLUMNS study tips 1 5,211 29-08-2017, 02:29 PM
Last Post: jaseela123
  PROJECT REPORT ON RURAL ROAD DEVELOPMENT study tips 1 4,177 28-08-2017, 03:20 PM
Last Post: jaseela123
  CHEMISTRY INVESTIGATRY PROJECT REPORT project maker 0 605 25-08-2017, 09:32 PM
Last Post: project maker
  Examination of a GIS-Based Water Quality Model using USGS Gaged Watersheds in Marylan mechanical wiki 0 9,927,445 25-08-2017, 09:32 PM
Last Post: mechanical wiki
This Page May Contain What is PROJECT TRACKING USING EARNED VALUE MANAGEMENT IN COST, TIME AND CARBON FOOT PRINT And Latest Information/News About PROJECT TRACKING USING EARNED VALUE MANAGEMENT IN COST, TIME AND CARBON FOOT PRINT,If Not ...Use Search to get more info about PROJECT TRACKING USING EARNED VALUE MANAGEMENT IN COST, TIME AND CARBON FOOT PRINT Or Ask Here

Options: